![]() |
![]() |
![]() |
![]() |
|
|
|||
|
|
|||
|
|
Work Continues on the
Skybolt
Christmas Bash at Bipe,
Inc. a Hit (Pictured at left: Me, Tucker, Bobbi, Paige,
Raul) For more pictures, click on the above picture. Allan Howard (Sharyn &
Bobby's Son) Gets Married L-R: Jerry & Lisa Finnegan (Allan's sister), Carrie Ann & Allan Howard, Sharyn & Bobby Howard.
Daytona Turkey Run is a
Hit Happy Thanksgiving!! For more Thanksgiving pictures, click here. Good Day at the RC
Field Oshkosh Was a Blast
Flying the Yellowbird
Copyright Allen Rice 2006 |
What's New!! 11/2/08- All the fuel tank panels are formed and fitted. 10/22/08- Started work on the fuel tank. 10/12/08- Pressure tested the smoke tank. 10/11/08- Welded the smoke tank seams, bungs, and filler neck. 10/4/08- Mocked up the smoke tank. 10/2/08- Created a Skybolt Master Index page with a button link on the Skybolt page. 9/29/09- Installed the accessory trays. 9/28/09- Finished the fuel valve system. 8/19/08- Work on the Skybolt- How to make simple brackets. 5/14/08- Added aircraft construction practices page with pictures. 2/16/08- Video of Alaskan bush pilots competition. 12/8/07- Sharyn & Bobby Howard's son marries Carrie Ann Mena. 11/24/07- Daytona Beach Turkey Run. Click here for more pictures of cars. 11/22/07- Thanksgiving at Lorie's. Click here for more pictures. 10/28/07- Good flying at the RC field. 8/10/07- Pictures and story of the P51 crash at Airventure. 8/5/07- Oshkosh, Airventure report. Lots of pictures at: Tucker's Website. 2/22/07- Finish welded the engine mount spools into the corners of the fuselage. 2/18/07- Formed the top corners of the fuse at station 0 to accept the engine mount spools. 2/16/07- Cut and formed the seat pans. 2/12/07- Skybolt throttle quadrants, trim lever, rudder cable fairleads, engine mount. 1/16/07- Finished all the floorboards. 1/12/07- Floorboards are cut and bent. 1/9/07- Fabbed and tacked floorboard brackets. 12/17/06- Mounted the brake master cylinders. 11/22/06- Fabricated the tailwheel mount. 11/19/06- New pictures of Tucker and Captain flying their RC planes. 11/14/06- Mounted the wheels & brakes. 11/1/06- Tack welded the reinforcing straps on the landing gear joints. 10/30/06- Landing gear axles are beveled for straps. 10/28/06- Both landing gear are all tack welded. 10/26/06- Fit and tacked the gear diagonal streamline tubes. 10/25/06- Fit and tacked the top landing gear cross tube. 10/24/06- Fit and tacked the landing gear axles. 10/21/06- Steel is going up on hangar in Steinhatchee. 7/25/06- Fit the rear landing gear bracket. 7/18/06- Built the axle support jigs. 7/5/06- Tack welded the fuel tank mounting bushings in place. 6/30/06- Mounted the elevator reverser and walking beam. 6/27/06- Welded in the rudder pedal mounts.
|
|
|